Renovations

Piping for a kitchen, a bathroom, or a new layout, including the gas.

A renovated bathroom with a wood vanity, sink, and toilet.
A bathroom vanity with a round mirror, and a shower in the reflection.
A renovated kitchen with a farmhouse sink, a range, and an island.
A white vessel sink with a gold faucet on a blue tiled wall.

Services we offer

Bathrooms
Toilets, sinks, showers, and tubs. We relocate fixtures for a new layout or easier access, upgrade valves, drains, and water pressure, and set water-efficient fixtures. Layout changes are planned so the work meets BC code.
Kitchens
Sinks, faucets, prep sinks, dishwashers, garburators, pot fillers, bar sinks, and water lines for fridges with ice and water. We work with your designer or contractor so the drains and supplies match the cabinets and counters.
Rough-in plumbing
Adding a bathroom or a basement suite starts with water lines, drainage, and venting. That rough-in is what makes the finished fixtures work.
Gas piping
Upgrades for a range, barbecue, fireplace, or patio heater, and new piping where a meter can be added. If natural gas is not available, many appliances can be converted to propane.

Renovations, planned before the walls close

  1. 01

    Before demolition

    We review the current layout, what has to move, and problems already in the walls, including old pipe such as Poly-B. Fixture choices come up here too, including in-wall valves, water-saving fittings, and rinse sprays.

  2. 02

    Permits

    We pull the plumbing permits and book the inspections the work needs.

  3. 03

    Rough-in and trim

    Piping goes in with the build, then fixtures are set once the room is ready.

Reviews

From the people we got to help

4.9

107 Google reviews

  • “Jordan and Matt removed and then installed three new toilets for us, and then later replaced a hot water tank. They kept right on top of communications, were on time, and were very friendly (and they didn't even mind me asking a few dumb questions). Thanks guys — you did a great job!”

    John

  • “Fireplace replacement and complete bathroom renovation. Tammy replaced the fireplace and identified and fixed a chimney issue. She was great to work with and explained all the steps. Jordan and Matt did a complete bathroom reno, on time, on budget, and it looks beautiful. They were so pleasant, we miss having them around!”

    Pat

  • “Completely renovated our bathroom top to bottom for us and the end result was beautiful. Jordan and team were so kind and helpful in the whole process!”

    Hanna

  • “High Tide Plumbing were my saviours! They were professional, efficient, and came in right on budget while removing and replacing two tub shower units in my home. They explained every step to me and were very polite. The cleanup afterwards was impeccable. I would hire them again without hesitation and highly recommend them to anyone.”

    Darcy

  • “Jordan and Matt roughed in our plumbing in an efficient, professional and engaging manner. They asked questions, answered ours, and scoped what to plan for later. They worked hard, turned up early and left late, cleaned up after themselves, and gave us the most helpful quote of the three we got, with the parts spelled out. Great job — we look forward to them coming back to finish.”

    Davidson

Read the reviews on Google

Contact

Ask about renovations

Call, or send the details. We will come back with a quote for this job.

Send a note

By sending this, you agree we can contact you by phone or email about this request. You can opt out of any later newsletters.

Questions

Should a plumber be involved before the design is finished?

Yes. Plumbing changes the layout, the permits, and where fixtures can sit. Bringing us in early keeps the design buildable.

Will you handle permits and inspections?

Yes. We look after plumbing permits and make sure the work meets local and provincial code.

Can you move plumbing if the layout changes?

Yes. A sink in a new spot or a shower on a different wall is a planned reroute, not a guess during demolition.

How long does the plumbing on a renovation take?

Most residential kitchen or bathroom plumbing runs from a few days to a couple of weeks, depending on access, fixture changes, and the other trades on site.